Civil Operating SurfaceNo active project contextProject context required

Rapid Civil Studio

Use the civil shell to advance site and corridor work, while keeping permit, packet, and capital continuity grounded in the same project command center.

Next action
Carry civil/site state into permitting only when project context is bound

Keep site readiness, jurisdiction routing, and downstream packet expectations anchored to the project command chain before treating permit or capital handoff as active.

Downstream packet impact

Civil output affects jurisdiction routing, permit packet completeness, field sequencing, and capital release posture. No project context means those downstream packets remain advisory.

Simply Perfect Home

Lifecycle OS

Plan stage is active in Rapid AI Civil Studio

Boundary planning, site drafting, and yield logic sit inside the plan stage. From here the next operator moves are permit packet, field dispatch, and finance readiness.

PlanPermitFieldFinanceTurnoverService

Authoring Trust

Civil authoring truth stays readable before it hits permit, field, and finance.

These trust states explain whether the current civil authoring state is safe to use downstream. They stay tied to live drafting validation, recent anchor edits, and AHJ grounding instead of optimistic UI progress.

Next Safe Moves

1. Move to Export and close the AHJ evidence gap before calling this permit-grade or downstream-ready.

2. Generate or refresh the drafting session first so the trust panel can evaluate real geometry.

Authoring validity

Awaiting state

Generate or refresh a drafting session before trusting downstream consequences.

Anchor integrity

Inactive

Anchor integrity turns on after a drafting session exists.

Downstream consequence trust

Planning only

Geometry is usable for planning, but AHJ grounding is not document_ready yet, so permit-grade and finance-grade consequence trust remain gated.

No override-only completion is being counted here. This panel is reading live validator and grounding signals before it says the draft is trustworthy.

Civil Canvas

Use the top actions for the next step. Keep tools and details in the side panels, and open Bob only when you need guidance.

Planning

Start with the site boundary

Draw or upload the full site boundary first. After that, load site context and build the editable plan.

Status: Draw a site boundary on the map to begin.

Core Site Adapter Warning

1 building-to-site warning(s) and 2 site-to-building response(s) are active.

Building deltas require a grading support score of 4.0, but the drafted site only carries 0.0 of grading capacity.

Bob

Ask plain-English questions or switch to command mode.