Missing core types: fixtures, equipment, ducts, pipes, vents, terminals, fittings, fire_protection, controls, ifc_flow_segment, ifc_pipe_segment
GROUNDED_ENDPOINThold
Segment depends on inferred or missing endpoints.
CLEARANCEhold
Clearance could not be measured because floor wall geometry is missing.
MAX_LENGTHpass
Length 67.2" within 360" max.
ORTHOGONALpass
Segment is orthogonal.
GROUNDED_ENDPOINThold
Segment depends on inferred or missing endpoints.
CLEARANCEhold
Clearance could not be measured because floor wall geometry is missing.
• No fixtures were recovered from explicit fixture blocks or wet-room inference.
• Equipment does not contain source-backed HVAC and plumbing anchors.
• Duct routing includes inferred or blocked segments.
• No routed pipes were generated.
• Vent terminals exist without routed vent segments.
• Terminal set includes inferred nodes.
• Fitting set includes inferred fittings.
• No fire protection objects were recovered from supported explicit blocks.
• Equipment does not contain source-backed controls metadata.
• Segment mep_seg_hvac_duct_mep_jn_1_hvac_mep_vent_1_fallback_mep_eq_1_air_handler_mep_eq_1_air_handler (duct) depends on inferred endpoints and is not routing-safe.
• Segment mep_seg_hvac_duct_mep_jn_1_hvac_mep_vent_1_fallback_mep_eq_1_air_handler_mep_eq_1_air_handler (duct) has no measurable wall graph for clearance validation.
• Segment mep_seg_hvac_duct_mep_vent_1_fallback_mep_jn_1_hvac_mep_vent_1_fallback_mep_eq_1_air_handler (duct) depends on inferred endpoints and is not routing-safe.
• Segment mep_seg_hvac_duct_mep_vent_1_fallback_mep_jn_1_hvac_mep_vent_1_fallback_mep_eq_1_air_handler (duct) has no measurable wall graph for clearance validation.
• Routing graph is missing required plumbing pipe segments.
• Routing graph is missing required vent segments.
• Routing graph is missing required fire protection pipe segments.
• IFC flow mapping is missing IfcFlowSegment.
• IFC flow mapping is missing IfcPipeSegment.
• IFC flow mapping still includes inferred graph elements and is not export-safe.
• IFC flow mapping is not coordinated because these trade lanes are not grounded: fixtures, equipment, ducts, pipes, vents, terminals, fittings, fire_protection, controls.
• Floor 1 includes inferred equipment tags.
• MEP sheets cannot be treated as coordinated while fire protection truth is not grounded.
• MEP sheets cannot be treated as coordinated while controls truth is not grounded.
• MEP coverage is missing core types: fixtures, equipment, ducts, pipes, vents, terminals, fittings, fire_protection, controls, ifc_flow_segment, ifc_pipe_segment.
• MEP coverage is 21.43%, below the 90% threshold.