Simply Perfect Home

Rapid AI Engineer & Site Audit

Rapid AI Checklist & Compliance Engine

Generate site-specific inspection milestones, verify framing/MEP compliance, and prepare for official sign-offs. Powered by Bob, your Field & Code Consultant.

Sign in to select a project context.Sign In

Completion Command

Select a project first so this inspection surface can show the closeout, release, turnover, and support chain truthfully.

Checking Capital OS access...

Rapid AI Civil Studio

Inspection sequencing + outcomes

Prod inspections now consume Labs5 sequencing, change-order triggers, closeout readiness, and warranty state directly.

Plan stages

0

Logged events

0

Change orders

0

Next required action

issue ntp

Inspection plan

Build the inspection workflow to generate staged inspections from the permit state.

Log field outcome

Recent inspection outcomes

No inspection outcomes logged yet.

Closeout + finance depth

Earned value

$0 · Amount due $0

Closeout documents

0 required · Warranty items 0

Final completion

pending · Fail count 0

Inspection execution

Production inspection workspace

Inspection plans, NTP, mobilization, field logs, and correction pathways are now exposed directly from the Labs5 construction chain instead of hiding inside generic result cards.

Starkville, MS
tracking pending

Intake truth

Blocked

Canonical project-assets chain

Remodel truth

Warning

No remodel basis attached yet

Twin sync

Not Started

Digital twin reconciliation has not started.

Trade truth

0 ready / 0 blocked

Structural, MEP, utilities

Envelope

Commercial tenant improvement

Commercial TI inspection procurement review · Inferred

Active project

Missing

Project selection required

Latest intake asset

None

No canonical plan/model asset found

Execution

Held

Inspection runtime unlocks only at smart_plan_ready

Execution truthblocked

Select an active project to read canonical intake truth.

Execution pages stay locked until a project is selected and the intake chain can be verified.

Permit, inspection, and official execution stay locked until the same project chain reaches `smart_plan_ready`.

Select an active project above

Remodel truth

No remodel basis detected

No explicit remodel evidence is attached to inspection intake yet.

Warning
Existing conditions basis: missing
Demolition scope: missing
Retained vs new: missing
Phasing profile: missing

If this is a remodel inspection lane, attach existing-conditions and phasing artifacts before final signoff.

Digital twin reconciliation

Digital twin reconciliation has not started.

Activate the digital twin and sync field evidence before expecting overlay alignment.

Not Started
Design-vs-field overlays: pending
Evidence synced: 0 assets
Commissioning readiness: in progress
Drift blockers: 0 failed inspections

Trade truth

Trade-by-trade field verification

Structural, MEP, and utilities readiness are tracked independently from overall inspection status.

Commissioning in progress

Structural

Warning

No trade-specific inspection record detected yet.

Required: 0 · Pass: 0 · Fail: 0

MEP

Warning

No trade-specific inspection record detected yet.

Required: 0 · Pass: 0 · Fail: 0

Utilities

Warning

No trade-specific inspection record detected yet.

Required: 0 · Pass: 0 · Fail: 0

Envelope truth

Commercial tenant improvement

Commercial TI inspection procurement review · Inferred

Warning

Inspection actions

Select an active project above

Inspection evidence

Truth stateBlocked
Relevant assets0
Project chainMissing
Execution unlocksmart_plan_ready

Query: Interior Finishes